Thread rolling machine operating procedures
1. Conscientiously implement the relevant provisions of the General Operating Procedures for Forging Equipment.
2. Conscientiously implement the following relevant supplementary provisions:
(1) Check the hydraulic oil storage tank before work, and the oil volume should be sufficient.
(2) Conscientiously do the following in the work:
1. In addition to throttling, other hydraulic valves are not allowed to be adjusted privately.
2. When replacing the roller, the movable bracket should be installed correctly, and it can only work after confirming that it is good.
3. When measuring the workpiece on the equipment, it is not allowed to use measuring tools when the workpiece is not allowed, and it is not allowed to use measuring tools or other pieces to beat the equipment.